Tiwi Geothermal Power Plant 

Tiwi, Albay

 

The 2 X 55 MW Tiwi Geothermal Plant 1 & 2 powerhouse is a concrete framed structure of masonry walls with metal roof frames and steel girders. Tiwi 3, 4, 5, and 6, on the other hand, are steel framed structures, generally metal clad. Works for these plant structures included site development, drainage system, access and inter-site roads, landscaping and security fencing, support facilities, interior utilities, fire protection system, electrical equipment, bases and foundations, and outside utilities such as water, sewerage disposal, and electrical lighting.