Cebu South Coastal Road Project

Segment 2, Roadway Section

March 2001

 

Under this project, F.F. Cruz & Co., Inc. constructed two bridges — 120 meters and 60 meters in length. Tubular steel piles, 800 mm in diameter were used for foundation. The six lane carriageways sit on Type IV prestressed concrete girders. The columns are circular and measure 2.0 meters in diameter. Related to the bridges are revetment works using concrete sheet piles and the fabrication and installation of wave dissipation blocks to prevent erosion of reclaimed materials.