F.F CRUZ & CO., Inc. - PROJECTS

Completed Projects




South Harbor Container Yard 1 & 2

Asian Terminal Inc.

March 2003

 

Demolition of small buildings; site clearance (8.5 has.); reclamation (1.5 has.) ground improvement; paving and drainage for container yard (10 has.); design and construction of an electrical system for crane power, refrigerated containers, and lighting system; construction of a water distribution system with fire fighting hydrants; gates and fences; and dredging of a 220-meter long access channel for barges.